References: Plant Services

Chemical Industry

GRASIM INDUSTRIES - sgnificant OE improvement for chemical complex

Significant OEE improvement of a chemical complex for fertilizer production

thyssenkrupp - replacement of cell elements for fertilizer plant

Project description

Grasim Industries is the flagship company in the Aditya Birla Group, India’s leading Caustic Soda manufacturer. The company invested in the thyssenkrupp group’s Bipolar Membrane Cell technology way back in 1992 for conversion of their then 260 tpd Mercury Cell Caustic Soda plant, and followed it up with no fewer than 6 contracts for replacement of cell element with new generation cell elements that provide considerable savings in terms of power consumption while improving product yield and reducing emissions.

Results

  • Present plant capacity: 400 tpd Caustic Soda
  • Power savings estimated at 280 GWh for 8 years for technology upgrades, equivalent to approx. 105,000 tons of CO² reduction in 8 years

Location: Nagda, India

Plant type: Membrane Cell Caustic Soda Complex

Service type: Revamps - Capacity Expansions, Technology upgrades

Gujarat Alkalies & Chemical Limited (GACL) - Power savings via Revamp

27 years and counting for record-breaking Indian Caustic Soda complex using tk group Membrane Cell technology

Power savings with revamp for Gujarat Alkalies

Project description

In 1992, then amongst India’s leading Caustic Soda manufacture operating out of Vadodara and Dahej in Gujarat India, embarked on a path-breaking decision to invest in the thyssenkrupp group’s Membrane Cell technology for their 200 tpd Mercury Cell plant. It was a decision that put the company on the Caustic Soda map of the country as the first company to adopt path-breaking technology to eliminate mercury wastes, and catapulted them into the position of India’s leading Caustic Soda manufacturer.

Since then, the company has invested many times over in terms of new generation cell elements in no fewer than 9 contracts, spanning 27 years. The plant, still operational and working at peak efficiency, now utilizes the new generation V and VI cell elements and remains a testimony of the tk group’s technological and sustainable solutions for a customer committed to working with the very best the industry can offer.

Results

  • Present plant capacity: 500 tpd Caustic Soda in Vadodara, 60 tpd Caustic Potash in Vadodara and 785 tpd Caustic Soda in Dahej
  • Power savings estimated at 180 GWh for 8 years for technology upgrades in Vadodara
  • Power savings estimated at 120 GWh for 8 years for technology upgrades in Dahej
  • Approx. 110,000 tons of CO² reduction in 8 years from Vadodara and Dahej

Customer: Gujarat Alkalies & Chemical Limited (GACL)

Location: Dahej, Gujarat, India

Plant type: Membrane Cell Caustic Soda Complex

Service type: Revamps - Capacity Expansions, Technology upgrades

Engineering consulting for PTT Global Chemical

Engineering consulting for PTT Global Chemical

thyssenkrupp Engineering cunsulting for PTT

Contract October, 2014 until present

Responsibilities

  • Feasibility studies, conceptual design & FEED Package
  • CAPEX cost estimating Services
  • Detail Engineering Design

Main Areas

  • HVU waste gas scrubber unit
  • Concrete paving process area
  • Crude line vibration
  • Covert heavy gas to olefins feed stock
  • Install MP steam pipe line for ?furnace
  • Improvement of waste water system
  • ...

Results

  • Safety excellence acknowledged by PTTGC
  • Improve plant operation reliabilities
  • Improve maintenance accessible
  • Improve environment impact

Customer: PTT Global Chemical Public Co., Ltd.

Location: Map Ta Phut, Rayong, Thailand

Plant type: Refinery and Petro chemical

Service type: Engineering Consultancy - Team Services

MISR Chemical Industries - operations training

MISR Chemical Industries - operations training

thyssenkrupp

Project description

Electrolysis plant

Training of operating personnel at Uhde's Petrochemical Training Center in Egypt

Customer: MISR Chemical Industries

Location: Alexandria, Egypt

Abu Qir Fertilizer Co. - revamp of field & control instrumentation

Abu Qir Fertilizer Co. - revamp of field & control instrumentation

thyssenkrupp

Project description

Ammonia and urea plant

Revamp of complete field and control room instrumentation

Customer: Abu Qir Fertilizer Co.

Location: Alexandria, Egypt

Karpatnaftochim Ltd. - Modernized new S-PVC plant

Modernized new S-PVC plant in chemical complex

service reference - modernized S-PVC plant

Project description

Karpatnaftochim Ltd. contracted thyssenkrupp Industrial Solutions to modernize the chemical complex with a new S-PVC plant.

The new plant consists of the core unit with 4 reactors a 150 m³ each and 2 degassing and drying lines as well as auxiliary units such as bagging, palletizing, waste water treatment, demin. water generation, and others.

Results

The new plant produces K-values?from 57 to 70 for rigid and flexible ?grades.

At the site a complete process chain?from caustic/chlorine via EDC/VCM to?PVC production is established by ?thyssenkrupp Industrial Solutions.

Customer: Karpatnaftochim Ltd.

Location: Kalush, Ukraine

Plant type: S-PVC

Service type: EP contract & technical supervision service

BorssodChem Zrt. - Capacity increase of oxichlorination unit

Capacity increase of oxichlorination unit

thyssenkrupp Service reference - BorsodChem

Project description

BorsodChem Zrt. contracted thyssenkrupp Industrial Solutions to increase capacity of existing oxichlorination unit by

  • Modified reactor cooling system
  • Additional heat exchangers
  • Increased operating pressure for reactor

Results

After the positive result of the feasibility study ?BorsodChem decided to revamp existing?oxichlorination unit with modified reactor ?cooling system.

Customer: BorsodChem Zrt

Location: Kazincbarcika, Hungary

Plant type: Plant for EDC production

Service type: Revamps, Basic engineering

JSC Sayanskimplast - Modernization of EDC/VCM/PVC chemical complex

Modernization of existing EDC/VCM/PVC chemical complex

thyssenkrupp

Project description

Sayanskimplast contracted thyssenkrupp Industrial Solutions to modernize existing VCM plant by installation of a new cracking unit.

Heat recovery has been implemented by installation of an external EDC evaporator. The old quench column was replaced by a new hot quench column for separation of tars and coke from cracking products.

Results

  • Capacity increase
  • Less fouling, therefore long operation ?period of furnace up to 2 years
  • Prevention of plugging in downstream?distillation unit

Customer: JSC Sayanskimplast

Location: Sayansk, Russia

Plant type: Plant for EDC/VCM production

Service type: Revamps, EPC contract

Styrolution (Thailand) Co., Ltd.

thyssenkrupp

Responsibilities

  • Feasibility studies, conceptual design, FEED and basic design package
  • CAPEX cost estimating Services
  • Detail Engineering Design

Main Areas

MPPU and infrastructure project

Results

  • Safety excellence acknowledgement by Styrolution
  • Upgrade SAN processed to achieve low
  • Residual Styrene monomer < 500 ppm and Acrylotrile < 10 ppm
  • Improve reliable of utilities system, i. e. Chillers and Air compressor

Customer: Styrolution (Thailand) Co., Ltd.

Location: Map Ta Phut, Rayong, Thailand

Plant type: Chemical plant

Service type: FEED & Basic design

Cement

Ashaka Cement - refurbished apron & spillage conveyor for energy saving

Re-use and refurbishment of existing components allow a successful and efficient project execution

thyssenkrupp_reference_ashaka cement

Project description

Ashaka Cement contracted thyssenkrupp Industrial Solutions to modernize a feed conveyor and spillage.

Parts of the old apron conveyor and spillage conveyor were removed and replaced with the new machine components. It was possible to retain the existing drives, the main and longitudinal beams.

Results

  • Reduction of power consumption by 10 %
  • Cost savings through maintenance optimization by 20 %

Cementa AB - turnkey project for cement mill

Cementa AB - turnkey project for cement mill

Cementa AB

Manufacturing and assembly of mill shell section for Cement mill 2, replacement of the bearings and sealing systems (inlet and outlet) as a turnkey project.

Customer:Cementa AB

Location: Slite, Schweden

Cementos del Norte - modernization of feed conveyor

Re-use and refurbishment of existing components allow a successful and efficient project execution

Modernization of feed conveyor - thyssenkrupp

Project description

Cementos del Norte contracted thyssenkrupp Industrial Solutions to modernize a apron feed conveyor.

Parts of the old apron feed conveyor were removed and replaced with the new machine components. It was possible to retain the existing drives, the main and longitudinal beams, and the drive and return shafts. The existing drive shaft was re-machined while all other components were delivered as new items.

Results

Reduction of power consumption by 10 %

Cost savings through maintenance optimization by 20 %

Customer: Cementos del Norte

Location: Honduras

Plant type: Crushing plant for cement production

Service type: Plant modernization

Cemex (today: LafargeHolcim) - Turnkey project cement mill exchange

Mixture of reused and new components allows a cost efficient and fast project execution

Cement mill exchange for Cemex - thyssenkrupp

Project description

Cemex contracted thyssenkrupp Industrial Solutions to exchange a

cement mill. A special challenge, the exchange had to be completed on turn key basis.

Parts of the cement mill were removed and replaced. It was possible to retain the motors, bearings and gear rim, pinions.

Customer: Cemex (today: Lafarge/Holcim)

Location: Beckum, Germany

Plant type: Cement grinding plant

Service type: Plant modernization

Ciplan-Cimento Planalto S.A. - performance increase of separator

Upgrade of separator increases output and saves investment costs

Performance increase for separator

Project description

Ciplan contracted thyssenkrupp Industrial Solutions to increase the performance of their separator. The time frame for the modification is usually between 5 and 12 days depending on the size and circumstances on-site.

Results

  • Increasing of separator efficiency
  • Increasing of grinding plant production
  • Energy savings

Customer: Ciplan-Cimento Planalto S.A.

Location: Brasilia, Brazil

Plant type: Cement grinding plant

Service type Plant modernization & performance increase

Codelco División Ministro Hales - Integrated Asset Management

Integrated Asset Management for gyratory crusher

Codelco División Ministro Hales

Project description

Integrated Asset Management with permanent thyssenlrupp team on site. Open book, performance based contract for 18 months (directly after commissioning thyssenkrupp equipment).

Equipment responsibility for gyratory crusher (KB 63 - 89), including discharge conveyor and overland conveyor (2.86km).

Tasks: Predictive, preventive and corrective maintenance including maintenance engineering and planning.

(Completion August 2013)

Customer: Codelco División Ministro Hales

Location: Copper Mine - Calama, Chile

HeidelbergCement - Exchange of powder cooler

Replacement of new efficient components into existing structures increase plant efficiency and save costs

thyssenkrupp exchanges powder cooler for Heidelberg Cement

Project description

HeidelbergCement contracted thyssenkrupp Industrial Solutions to exchange a powder cooler Ø 2,5m x 6,5m. As special challenge, the exchange had to be completed in 15 working days on turn key basis.

Parts of the old powder cooler were removed and replaced with the new bigger machine. It was possible to retain the substructure and water system.

Results

  • Increase of productivity
  • Less power consumption by 35 %

Customer: HeidelbergCement

Location: Schelklingen, Germany

Plant type: Cement grinding plant

Service type:Plant modernization & performance increasing

HeidelbergCement AG - turnkey project for kiln roller station

HeidelbergCement AG - turnkey project for kiln roller station

imagedummy

Project description

Cement plant

Manufacturing and assembly of kiln roller station II (turnkey project) with a splined kiln tyre. Manufacturing and assembly of kiln roller station III with slipping tyre was already done in 2008.

Customer: HeidelbergCement AG

Location: Schelklingen, Germany

Huasheng - replacement of components with tailor made concepts

Replacement of components with tailor-made concepts save costs

Huasheng

Project description

Huasheng contracted thyssenkrupp Industrial Solutions to modernize two kiln clinker coolers.

thyssenkrupp Industrial Solutions delivered the modular cooler concept POLYTRACK.

Results

  • For two lines the existing Sinoma coolers were replaced with POLYTRACK with intermediate crusher
  • Cost savings through maintenance optimization by 15 %
  • Throughput was increased
  • Clinker end temperature was decreased drastically
  • Cooler efficiency was increased

Customer: Huasheng

Location: China

Plant type: Plant for cement production

Service type: Plant modernization

JIMAH Power Plant - repair after fire damage

JIMAH Power Plant - repair after fire damage

JIMAH Power Plant

Project description

Repair after fire damage. Fabrication and erection of main elements of the carrying steel structures under-carriage and upper-carriage plus parts of the tripper-car. Renovation of machine parts and parts of conveyor system.

Customer: JIMAH Power Plant

Location: Mukim Jimah, Malaysia

Equipment: Stacker Reclaimer SR - 2

Märker Zement GmbH - delivery & assembly of mill slide ring

Märker Zement GmbH - delivery & assembly of mill slide ring

Project description

Delivery and assembly of mill slide ring as well as extension of grinding track of department 2.

Customer: Märker Zement GmbH

Location: Lauffen am Neckar, Germany

National Cement Company - revamp of crushing plant

Mixture of refurbished and new components allows a cost efficient project execution

National Cement company - Revamp of a crushing plant by thyssenkrupp

Project description

National Cement contracted thyssenkrupp Industrial Solutions to revamp their crushing plant. As a special challenge, thyssenkrupp had to retrofit a crusher from a third party.

Parts of the crusher were reengineered, removed and replaced with new machine components. It was possible to retain the existing drives and crusher housing.

Results

  • Improvement of the performance
  • Less investment costs compare to complete new crushing plants by 50 %

Customer: National Cement Company

Location: Cairo, Egypt

Plant type: Crushing plant for cement production

Service type: Plant modernization & expansion

PHOENIX Zementwerke - New graphite block seal for increased kiln performance

Rotary kiln with graphite block seal- effective sealing, designed for easy mounting

PHOENIX Zementwerke

Project description

The client PHOENIX decided to install our new designed kiln outlet sealing system with graphite blocks.

A special challenge was the short delivery time for creating the technical drawings and manufacturing. And of course the installation for this unknown prototype during 10 days.

Results

  • False air reduced
  • Performance increased
  • Increased secondary air use
  • Clean and safety burner platform

Customer: PHOENIX Zementwerke

Location: Beckum, Germany

Plant type: Plant for cement production

Service type: Spare parts

P.T. Semen Tonasa - Delivery & installation of rollsizer

Installation of new components into existing structures saves costs for our customers

P.T. Semen

Project description

P.T. Semen Tonasa contracted thyssenkrupp Industrial Solutions to deliver a rollsizer and integrates it into the process. As special challenge, the existing concrete structure, feed and discharge conveyor had to be re-used.

Results

  • Improvement of the performance
  • Due to wear reduction, 30 % costs reduction for maintenance
  • Less investment costs compared to complete new crushing plants by 50 %

Customer: P.T. Semen Tonasa

Location: Indonesia

Plant type: Plant for cement production

Service type: Plant modernization & optimization

Rohrdorfer Zement - renovation of kiln plant

Rohrdorfer Zement - renovation of kiln plant

Project description

Comprehensive renovation of kiln plant with planetary cooler and upgrading to state-of-the-art technology within planned budget and timeline.

Customer: Rohrdorfer Zement, Portland cement plant

Location: Rohrdorf, Germany

Schwenk Zement KG - modernization of kiln cooler

Replacement of components with cost saving thought-out assembly concepts

Kiln cooler modernization for Schwenk Zement

Project description

SCHWENK Zement KG contracted thyssenkrupp Industrial Solutions to modernize their kiln cooler. thyssenkrupp delivered the modular cooler concept POLYTRACK. To reduce the plant downtime, the cooler was preassembled beside the existing cooler. After the disassembly of the old cooler the complete POLTRACK was moved on rails into his final position.

Results

  • Cost savings through maintenance optimization by 15 %
  • 25 % assembly time reduction, due to preassembly beside the existing cooler

Location: Germany

Plant type: Plant for cement production

Service type: Plant modernization

Schwenk Zement KG - modernization of feed apron conveyor

Schwenk Zement KG - modernization of feed apron conveyor

Schwenk Zement - modernization of apron feed conveyor

Project description

SCHWENK Zement KG contracted thyssenkrupp Industrial Solutions to modernize a feed apron conveyor. As special challenge, the conversion had to be completed in 20 working days during the coldest weeks of the year (- 20 °C and freezing rain).

Parts of the old apron conveyor were removed and replaced with the new machine components. It was possible to retain the existing drives, the main and longitudinal beams and the drive and return shafts. The existing drive shaft was re-machined while all other components were delivered as new items. ??

Results

  • Reduction of power consumption by 10 %
  • Cost savings through maintenance optimization by 20 %

Customer: SCHWENK Zement KG

Location: Karlstadt, Germany

Plant type: Crushing plant for cement production

Service type: Plant modernization

Training of international customers

Training of international customers in Germany and on site

imagedummy

Project description

Practical exercises and theoretical lectures of operating and maintenance staff and in 15 different training units.

  • Participants: 156
  • Duration: 67 days
  • Languages: German, English, French, Spanish

Location: Beckum, Germany & on site

Yanbu Cement - delivery of wobbler

Replacement of new efficient components into existing structures increases plant efficiency and saves investment costs

Wobbler delivery for Yanbu Cement - thyssenkrupp

Project description

Yanbu Cement contracted thyssenkrupp Industrial Solutions (tkIS) to deliver a wobbler. As special challenge, tkIS has to contracted this machine on EPC basis including using of the existing substructure.

Results

  • Less wear at the crusher rotors
  • Increasing of crusher plant capacity by 20 %
  • Less invest cost compare to complete new crushing plants by 50 %

Customer: Yanbu Cement

Location: Yanbu, Kingdom of Saudi Arabia

Plant type: Plant for cement production

Service type: Plant modernization & optimization

Vissai Cement Company - Delivery & installation of new kiln burner POLFLAME VN

Re-use and refurbishment of existing components allow a successful and efficient project execution

thyssenkrupp reference - POLFLAME Burner

Project description

Vissai Cement contracted thyssenkrupp Industrial Solutions to deliver our new custom made POLFLAME kiln burner.

A special challenge was the implementation into the existing structure.

Customer: Vissai Cement Company

Location: Ninh Binh, Vietnam

Plant type: Plant for cement production

Service type: Plant modernization

Zementwerk Hatschek - installation of new separator

Installation of new components into existing structures save invest costs and increase the performance of the complete unit

Installation of separator - Zementwerk Hatschek

Project description

Zementwerk Hatschek contracted thyssenkrupp Industrial Solutions to install a new separator. The time frame for the modification is usually between 10 -12 days depending on the size and circumstances on site.

Results

  • Increasing of separator efficiency
  • Increasing of grinding plant production
  • Energy savings

Customer: Zementwerk Hatschek

Location: Gmunden, Austria

Plant type: Cement grinding plant

Service type: Plant modernization & performance increase

Mining

Refurbishment of car dumper barrel for CSN

Re-use and refurbishment of existing components allow a successful and efficient project execution

Refurbishment of car dumper barrel for CSN

Project description

Project consists of replacing the existing Car Dumper Barrel. Existing equipment is from a known competitor which is reaching end of structural lifecycle. New parts must be geometrically suitable to the existing basement. Drive components and electrical infrastructure must be reused. Main mission involves optimize the production by increasing the equipment availability for operation and increasing expected life period.

Results

  • Increase of availability for operation
  • Increase of equipment expected life period
  • Design of a modern equipment to optimize maintenance

Reliable bucket wheel excavator for NLC India

Enhanced lignite productivity attained through reliable bucket wheel excavators (BWE) & conveyors system

Performance based maintenance contract for NLC - thyssenkrupp

Project description

Performance based maintenance contract involves all maintenance aspects of Bucket Wheel Excavators (BWE) – 2 Nos & Conveyors

– 2 System round the clock with predefined operating consumables and spares.

Results

  • 4.7 million incident free man hours
  • Productivity improved year over year (Y-O-Y) by 2 %
  • Equipment availability > requisite ?since from inception

Location: Neyveli, India

Plant type: Open Cast Lignite Mines/

Bucket Wheel Excavators & Conveyors

Service type: Asset Management – Maintenance contract

Compañía Minera Doña Inés de Collahuasi - Revamp

Increasing lifetime and maintainability through spare parts availability

Revamp for Compania de Minera Dona Ines de Collahuasi

Project description

Compañía Minera Doña Inés de Collahuasi contracted thyssenkrupp Industrial Solutions to revamp the current ship loading system. Modernization includes: overhaul of driving and rolling system of Portal Reclaimer and a complete refurbishment of VDF’s and control system of Shiploader and Portal Reclaimer.

Results

Restore the Portal Reclaimer to its original operational condition and extend the lifetime 

Increase system availability by establishing

redundancy in communications

Migrate the obsolete VDF system

to technology with available spare parts

Contract duration: 8 months

Location: Iquique, Puerto Collahuasi, Chile

Plant type: Copper concentrate storage and ship loading system

Service type: Revamp & modernization

AOS aluminiumoxid - repair of bucket wheel excavator after collision

AOS aluminiumoxid - repair of bucket wheel excavator after collision

AOS - Repair of bucket wheel excavator

Project description

Collision of the ballast box with the stockpile, thus resulting in collapse. Disassembly, salvaging and assessment of the damaged device; refurbishment or re-procurement in line with the state of the art; delivery and commissioning of the replacement device.

Customer: AOS aluminiumoxid

Location: Stade, Germany

KPC - modification of shiploader

KPC - modification of shiploader

KPC - modification of shiploader

Project description

Modification of the shiploader North and South. Fabrication and erection of main elements of the carrying steel structures for the upper-carriage. Renovation of machine parts and parts of conveyor system.

Location: Kalimantan (Borneo), Indonesia

Customer: KPC

EPS (Elektropriwreda Srize) - 10 gearboxes of different types

EPS (Elektropriwreda Srize) - 10 gearboxes of different types

thyssenkrupp Gearboxes for EPS

thyssenkrupp Industrial Solutions was supplying various gear-unit types within the framework of a new-build order for a bucket wheel excavator.

From belt gear units to a swivel gear weighing 15 tonnes. In relation to this, every high standard with regard to date specifications, costs and customer satisfaction was implemented.

Customer: EPS (Elektropriwreda Srize)

Location: Serbia

RWE Power - Modification of winch drive braking system

RWE Power - Modification of winch drive braking system

RWE power

Project description

RWE Power AG contracted thyssenkrupp Industrial Solutions to revamp a bucket wheel excavator. As special challenge, the modification of winch drive braking system had to be completed.

Parts of the old braking system were removed and replaced with the new designed machine components. It was possible to retain the existing drives. Existing brakes from customers stockyard were implemented, all other components were delivered as new items.

Results

  • Reduction of customer’s tied-up capital,
  • Standardization of components,
  • Cost savings for future maintenance activities

Customer: RWE Power AG

Location: Hambach, Germany

Plant type: Bucket wheel excavator

Service type: Modernization

Coke & Steel

ArcelorMittal - Coke plant refurbishment

Minimized production loss by refurbishment at operating plant

thyssenkrupp coke plant refurbishment

Project description

ArcelorMittal Gent contracted thyssenkrupp to undertake the refurbishment of their existing coke plant to prolong the lifetime of their battery. The contract scope was the refractory repair including the partial engineering of the mechanical and refractory parts.

An important part of the contract was the handling and removal of asbestos in cooperation with the client and the official governmental agencies.

Redesign of oven doors and full refurbishment.

Results

  • Extension of lifetime
  • Emission reduction
  • Asbestos free operation

Location: Gent, Belgium

Plant type: Coke plant

Service type: Revamps battery refurbishment

ArcelorMittal - Maintenance for battery

More than 20 years of customer relationship

ArcelorMittal - thyssenkrupp maintenance on battery

Project description

thyssenkrupp Uhde Engineering Services is contracted by ArcelorMittal Bottrop to perform maintenance on their battery on a year-to-year basis for more than 20 years. All necessary maintenance on refractory material is carried out including additional major projects and repairs where needed.

Results

  • Ensure future readiness for the production
  • Ensure that the emission requirements are met
  • Extension of lifetime

Customer: ArcelorMittal Bottrop/Prosper

Location: Bottrop, Germany

Plant type: Coke Plant

Service type: Maintenance

Eregli Demir ve Celik - Refurbishment of refractory parts for life time extension

Refurbishment of refractory parts

thyssenkrupp - service reference - Eregli Demir ve Celik

Project description

Eregli Demir ve Celik contracted thyssenkrupp Uhde Engineering Services to perform refurbishment of the refractory parts with special attention taken to the engineering and redesign of the end flues.

The scope consisted of the demolition of the existing and rebuild of the end flues in parallel with involvement of the client for asbestos removal performed according to the instruction of thyssenkrupp.

Results

  • Reduction of emissions
  • Extension of lifetime
  • Safe asbestos removal

Customer: Eregli Demir ve Celik

Location: Eregli, Turkey

Plant type: Coke plant, Koppers-Becker

Service type: Revamps

Essar Steel Algoma - Battery refurbishment

Fastest repair in North America for battery refurbishment

thyssenkrupp reference - Essar Steel Algoma

Project description

thyssenkrupp Uhde Engineering Services (tkUES) was contracted by Essar Steel Algoma for the refurbishment of nine through-walls. During the initial execution, tkUES was further contracted to refurbish additional three walls during the execution period. tkUES performed this additional work before the original expiry deadline.

Results

  • Fastest repair in North America
  • All work executed in a half-year period
  • Ensure the future plant production

Customer: Essar Steel Algoma

Location: Sault Ste Marie, Canada

Plant type: Coke plant

Service type: Revamps

Electricity Supply Board - Repair after fire damage

Repairing of Moneypoint Power Station after fire

Electricity Supply Board

Stacker / Reclaimer 1

Project description

Repair after fire damage. Fabrication and erection of the bucket-wheelboom endpart including pivot point. Change of the main roller bearing. Reinforcement of the under-carriage due corrosion damage. Renovation of machine -parts and parts of conveyor system.

Fertilizer

BASF - Advanced process control for ammonia plant

BASF - Advanced process control for ammonia plant

thyssenkrupp

BASF

Antwerp, Belgium (Completion 2001)

Ammonia plant

Advanced Process Control (APC)

Return on investment for APC < 1 year

Egyptian Fertilizer Co. - maintenance engineering, planning & execution

Egyptian Fertilizer Co. - maintenance engineering, planning & execution

thyssenkrupp

Project description

Review of maintenance engineering, planning and execution

Comprehensive Report including detailed plans for implementation of optimisation

Location: Ain Sukhna, Egypt

Qatar Fertiliser Company - new supply station & revamp

Qatar Fertiliser Company - new supply station & revamp

thyssenkrupp

Project description

New high-voltage supply station for fertilizer plants 1 and 2. Plant 3 was revamped to increase capacity up to 36%

Customer: Qatar Fertiliser Company

Location: Mesaieed, Qatar

Refinery

SCG Thai Polyethylene Co. Ltd. - Capacity increase for LDPE autoclave plant

Capacity increase of LDPE autoclave plant

Revamp for SCG Thai Polyethylene

Capacity increase of LDPE autoclave plant

Project description

SCG THAI Polyethylene Co. Ltd contracted thyssenkrupp Industrial Solutions to revamp existing LDPE autoclave reactor by adding tubular tail reactor.

Furthermore the secondary compressor has been replaced by a larger machine and a new high pressure separator was implemented. ?As special challenge, the major site activities had to be completed during 80 days plant shutdown.

Capacity old/new 100 kta/152 kta

Start-up 1996

Start-up revamp 2017

Results

Capacity increase of 52 % by adding ?a tubular tail reactor to an existing?LDPE autoclave reactor

Location: Map Ta Phut, Thailand

Plant type: LDPE (Autoclave)

Service type: Revamps, EPC contract

Binh Son Refining and Petrochemical - training for O&M personnel

Binh Son Refining and Petrochemical - training for O&M personnel

thyssenkrupp O&M training - Binh Son Refining and Petrochemical

Project description

Training for the entire O&M personnel of a newly built refinery in Vietnam. The training was executed in a dedicated training facility in Vietnam as well as at a similar refinery.

Customer: Binh Son Refining and Petrochemical Co. Ltd.

Location: Dung Quat, Vietnam

Petroconsult - training & assistance for plant commissioning

Binh Son Refining and Petrochemical - training for O&M personnel

Project description

Coordination, assessment and theoretical and practical training of some 400 trainees as operating personnel for a Petrovietnam refinery in Dung Quat, Vietnam

Additional assistance in commissioning the plant

Customer: Petroconsult

Location: Dung Quat, Vietnam

Oil & Gas

Mellitah Oil & Gas - Full service maintenance

Mellitah Oil & Gas - Full service maintenance

Mellitah Oil & Gas

Project description

Full Service Maintenance contract as a direct follow-up to the commissioning phase. The scope of work included the setup of the camp and the workshops.

Customer: Mellitah Oil & Gas

Location: Libya

Mellitah Oil & Gas - maintenance training

Mellitah Oil & Gas - maintenance training

Mellitah Oil & Gas

Project description

Wafa Oil & Gas Field

Maintenance training for customer’s engineers from various disciplines in a training facility in Germany as well as on-the-job training in Libya.

Customer: Mellitah Oil & Gas

Location: Libya

You want to know more about our plant services?

We provide comprehensive solutions for servicing our customers along the entire plant life cycle - to ensure the best performance of your plants and machines. From spare and wear parts supply and management to workshop and field services, to revamps and outages , as well as consulting and plant management. That is what we call 360° Service.