Modularization References
Client: MOL
Location: Tiszaújváros, Hungary
Period: 2017 - 2020
Modularisation Scope/Description:
tkIS proprietary process technology, 5 train batch plant.
45 Process Modules planned and designed by tkIS according to Hungarian standards and PED (EU) certified. Modules fabricated and assembled in Thailand with all piping and equipment installed, tested and insulated.
Number of Modules: 45
Module design envelope: 27m (L) x 5.5m (W) x 4.5m (H) – Weight max 140t
Plasma Solids Experimental Platform / EPF, China (Completion 2016)
Capacity: 40 MT/day of electronic waste
The Client intends to build a pilot plant with its plasma gasifier to experiment with different type of solid feedstock. This plant will be built and tie-in to the existing complex. tkIS performed basic and detail engineering for this plant based on modular construction concept and later on for EPF.
Client: Oxiteno
Location: Pasadena, TX, USA
Period: 2015 - 2018
Modularisation Scope/Description:
tkIS proprietary process technology, 2 train batch plant.
14 Process Modules planned and designed by tkIS according to USA standards and PE certified. Modules fabricated and assembled in Thailand with all piping and equipment installed, tested and insulated.
Number of Modules: 14
Module design envelope: 24m (L) x 5m (W) x 4m (H) – Weight max 120t
Client: Oxiteno
Location: Coaszacoalcos, Mexico
Period: 2012
Modularisation Scope/Description:
Single train batch plant.
tkIS executed the Basic and Detail Engineering for a single train batch plant for Inventa (Licensor)
The tkIS designed plant comprised 3 Process Modules according to USA standards. Modules fabricated and partially assembled in Spain.
Number of Modules: 3
Module design envelope: 24m (L) x 5m (W) x 4m (H) – Weight max 70t
Client: Oxiteno Nordeste SA
Location: Camacari, Brazil
Period: Mar, 2014 - Jun, 2014
Modularisation Scope/Description:
tkIS executed the Basic and Detail Engineering for a Fatty Amine Process plant including OSBL scope. As part of the Basic Engineering tkIS developed together with the Licensor (Inventa) a Modular Layout concept.
Number of Modules: 15
Module design envelope: 24m (L) x 5m (W) x 4m (H) – Weight max 90t
APCI Tees Valley EFW Project - Phase 1
Client: Alter NRG Corp. / Great Britain
Location: United Kingdom
Period: 2012 - 2013
Modularisation Scope/Description:
tkIS support Alter NRG already in BD and the conceptual design of the plant. Modules are fabricated in Thailand, Design following European requirement e.g. PED/CE certification.
Number of Modules: 4
Module design envelope: 6.5m (L) x 12.75m (W) x 9m (H) – Weight max 61t
Client: Alter NRG Corp. / Great Britain
Location: United Kingdom
Period: Nov, 2013 - Nov, 2014
Modularisation Scope/Description:
Alter NRG awarded tkIS Thailand to design and fabricate the 2nd phase of the Project with an identical capacity as Phase 1.
Number of Modules: 4
Module design envelope: 6.5m (L) x 12.75m (W) x 9m (H) – Weight max 61t
Aker TS-VRU 8 Modules Project
Client: Aker Cool Sorption A/S / Worldwide
Location: Denmark
Period: 2012
Modularisation Scope/Description:
tkIS evaluated different concepts (containerised, module and stick built design) for the complete product range including cost comparison for potential plant location in Europe, Asia and South America.
Number of Modules: Varied based on Plant Configuration
Module design envelope: Standard Shipping Container – Weight max 2t
Devil Creek Onshore Gas Plant Development
Client: Clough Australia
Location: Western Australia, Australia
Period: 2009
Modularisation Scope/Description:
Detailed design and procurement Assistance of the Apache/Santos owned Devil Creek Gas Development Project, North - Western Australia. The project is a green field onshore gas process plant. The plant was design to be fabricated and modularised in Thailand then transported to Australia.
Number of Modules: 61
Module design envelope: 36m (L) x 9m (W) x 6.7m (H) – Weight max 202t
Songkhla Oil Field Development
Client: NuCoastal (Thailand) Limited
Location: Songkhla, Thailand
Period: 2007-2008
Modularisation Scope/Description:
Detailed engineering and design of the Songkla process and well head platform. tkIS also assisted in the procurement process for Long Lead Items.
Number of Modules: 2
Module design envelope: Confidential
Alcan Gove PAMs
Client: Alcan Australia
Location: Australia
Period: 2006
Modularisation Scope/Description:
Detailed design of a number of pre-assembled modules (PAM’s) which we shipped by sea from Thailand to Australia for the G3 Expansion of Alcan’s Gove alumina refinery. tkIS undertook the detailed design of process and pipe rack PAM’s weighing up to 500 tons.
HDS2 Project (Diesel Hydrotreater)
Client: Shell
Location: Geelong, Australia
Period: 2002 – 2003
Modularisation Scope/Description:
Pipe Rack and Process Modules planned and designed by tkIS. Modules fabricated in Brisbane and assembled in Brisbane with all piping and equipment installed, tested and insulated.
Barge used to transport modules down to Port of Geelong (adjacent to Refinery), unloaded and lifted into position on pre-cast columns.
Module design envelope: 27m (L) x 6m (W) x 5.8m (H) – Weight max 55t
Diesel Hydrotreater No#2 (DHTU2) Project
Client: Caltex
Location: Brisbane, Australia
Period: 2008 - 2009
Modularisation Scope/Description:
10 Pipe Rack Modules planned and designed by tkIS. Modules fabricated and assembled in Brisbane with all piping and equipment installed, tested and insulated.
Modules to Lytton Refinery by road, unloaded and lifted into position on pre-cast columns.
Number of Modules: 10
Module design Envelope: 24m (L) x 6.5m (W) x 4.5m (H) – Weight max 55t
RCCU Particulates Reduction Project
Client: Shell
Location: Geelong, Australia
Period: 2006 - 2007
Modularisation Scope/Description:
Module planned and designed by tkIS. Module contained 4th stage separator fabricated in workshop and then assembled in on temporary footings adjacent to final position. Module lifted into existing structure using 500t crane.
Number of Modules: 1
Module design envelope: 11.7m (L) x 10.5m (W) x 17.5m (H) – Weight max 171t
Third Stage Expansion Project
Client: Nabalco (ALCAN)
Location: Gove, Australia
Period: 2005 - 2006
Modularisation Scope/Description:
120 Pre-assembled Modules planned and designed by tkIS. Modules fabricated and assembled in Thailand workshop with all piping and equipment installed, tested and insulated.
Transport modules by sea to Gove, unloaded and transported to site, lifted into position on existing structures.
Clean Fuels Project
Client: ExxonMobil
Location: Altona, Australia
Period: 2004 - 2005
Modularisation Scope/Description:
Process Modules for DHTU and BRU planned and designed by tkIS. Modules fabricated and assembled in workshop with all piping and equipment installed, tested and insulated.
Transport modules by road to Altona Refinery site, unloaded and lifted into position on existing structures.
Module design envelope: 5.5m (L) x 4.8m (W) x 4.5m (H) – Weight max 38t