Referenzen im Bereich By-product plants

Formosa Ha Tinh Steel Corp.

Ha Tinh, Vietnam (Fertigstellung 2015)

Kapazität: 150,000 Nm3 COG/h

Complete plant; supply of engineering, special equipment and advisory services during erection and commissioning

Hüttenwerke Krupp Mannesmann (HKM)

Duisburg, Germany (Fertigstellung 2014)

Kapazität: 85,000 Nm3 COG/h

Installation of a 2nd train plant within the extremely limited space as brownfield expansion at the existing plant;

Installation of the new compact Jet Loop Reactor technology for biological waste water treatment;

EPC contract

imagedummy

Hyundai Steel Corp. (HSC)

Dangjin, South Korea (Fertigstellung 2009-2013)

Kapazität: 340,000 Nm³ COG / h

Complete plant; supply of engineering, special equipment and advisory services during erection and commissioning

imagedummy

Dragon Steel Corp. (DSC)

Taichung, Taiwan (Fertigstellung 2009-2012)

Kapazität: 136,000 Nm3 COG/h

Complete plant; supply of engineering, special equipment and advisory services during erection and commissioning

POSCO, Gwangyang works, phase 5

Gwangyang, South Korea (Fertigstellung 2010)

Kapazität: 175,000 Nm3 COG/h

Complete plant including biological waste water treatment plant;

Supply of engineering, special equipment and advisory services during erection and commissioning

Zentralkokerei Saar (ZKS)

Dillingen, Germany (Fertigstellung 2010)

Kapazität: 86,000 Nm3 COG/h

Plant modernized as well as partly renewed during continuous operation; EPC contract