Referenzen im Bereich By-product plants
Formosa Ha Tinh Steel Corp.
Ha Tinh, Vietnam (Fertigstellung 2015)
Kapazität: 150,000 Nm3 COG/h
Complete plant; supply of engineering, special equipment and advisory services during erection and commissioning
Hüttenwerke Krupp Mannesmann (HKM)
Duisburg, Germany (Fertigstellung 2014)
Kapazität: 85,000 Nm3 COG/h
Installation of a 2nd train plant within the extremely limited space as brownfield expansion at the existing plant;
Installation of the new compact Jet Loop Reactor technology for biological waste water treatment;
EPC contract

Hyundai Steel Corp. (HSC)
Dangjin, South Korea (Fertigstellung 2009-2013)
Kapazität: 340,000 Nm³ COG / h
Complete plant; supply of engineering, special equipment and advisory services during erection and commissioning

Dragon Steel Corp. (DSC)
Taichung, Taiwan (Fertigstellung 2009-2012)
Kapazität: 136,000 Nm3 COG/h
Complete plant; supply of engineering, special equipment and advisory services during erection and commissioning
POSCO, Gwangyang works, phase 5
Gwangyang, South Korea (Fertigstellung 2010)
Kapazität: 175,000 Nm3 COG/h
Complete plant including biological waste water treatment plant;
Supply of engineering, special equipment and advisory services during erection and commissioning
Zentralkokerei Saar (ZKS)
Dillingen, Germany (Fertigstellung 2010)
Kapazität: 86,000 Nm3 COG/h
Plant modernized as well as partly renewed during continuous operation; EPC contract