References: Coke plant technologies
Jinhui Coal Coking Co. Ltd.
Xiaoyi, P.R. China (Completion 2021)
Capacity: 2,100,000 t/year, 140 ovens, chamber height 6.78m
Speciality: COMBIFLAME®, Rich gas, Underjet, Stamp charge
ArcelorMittal
Tubarao, Brazil (Completion 2021)
Capacity: 600,000 t/year, 49 ovens, chamber height 5.50m
Speciality: COMBIFLAME®, Compound, Gun flue

ArcelorMittal
Gent, Belgium (Completion 2015-2019)
Capacity: Design: OTTO Oven height: 6.7m
Repair of
- end flues incl. asbestos removal
- buckstays
- armour plates
- door frames
- doors
Repair engineering
Material logistics
Supply and quality control of refractory material
Site management and supervision
Execution of all kinds of refractory and steelwork
Heating / Commissioning
JFE Steel Corporation
Kurashiki, Japan (Completion 2010-2015)
Capacity: 1,870,000 t/year of coke168 ovens, chamber height up to 6.8m
Speciality COMBIFLAME®, Compound, Underjet, Controlpress
Hüttenwerke Krupp-Mannesmann (HKM)
Duisburg, Germany (Completion 2013)
Capacity: 1,130,000 t/year of coke, 70 ovens, chamber height 7.85m
COMBIFLAME®, Compound, Gun flue, PROven, Controlpress

ArcelorMittal
Seraing, Belgium (Completion 2004, 2010-2014
Capacity: Design: Koppers Oven height: 4.0m
Repair of
- throughwalls
- end flues incl. roof and corbel area
- buckstays
- armour plate
- door frames
Repair engineering
Set-up of site facilities
Supply of auxiliaries and refractory material
Supervision of refractory and mechanical installation
Execution of all kinds of refractory and steel work
Heating / commissioning

Essar
Sault Ste Marie, Canada (Completion 2011-2012)
Capacity: Design: Willpute Oven height: 5.1m
Repair/replacement of
- throughwalls
- regenerators
- buckstays
- armour plates
- door frames
Repair engineering
Set-up of site facilities
Supervision of refractory and mechanical installation
Execution of all kinds of refractory and steel work
Heating/commissioning
POSCO
Gwangyang, South Korea (Completion 2010-2012)
Capacity: 2,800,000 t/year of coke, 200 ovens, chamber height 7,63m
COMBIFLAME®, Compound, Underjet, PROven, Controlpress

ArcelorMittal
Bottrop, Germany (Completion 2011)
Engineering, delivery, installation and commissioning of a pushing emissions control system including optimised sequence planning to avoid lengthy plant stoppage times.

JFE Steel Corp.
Kurashiki, Japan (Completion 2010)
Capacity: 400,000 t/year of coke
Construction of a new coke oven battery; basic engineering, supply of special equipment, supervision of construction and commissioning activities
Hyundai Steel Company
Dangjin, South Korea (Completion 2009-2012)
Capacity: 5,000,000 t/year of coke, 380 ovens, chamber height 7.63 m
COMBIFLAME®, Compound, Underjet, PROven, Controlpress

Dragon Steel Corporation
Taichung, Taiwan (Completion 2009-2012)
Capacity: 2,280,000 t/year of coke, 168 ovens, chamber height 7.35 m
COMBIFLAME®, Compound, Gun flue, Controlpress
Wuhan Iron and Steel Group Corporation
Wuhan, China (Completion 2008)
Capacity: 2,000,000 t/year of coke, 140 ovens, chamber height 7,6 m
Shougang Jingtang United Iron & Steel Company
Caofeidian, China (Completion 2008-2010)
Capacity: 4,200,000 t/year of coke, 280 ovens, chamber height 7.63 m
COMBIFLAME®, Compound, Underjet, PROven, Controlpress

Tata Steel
Ijmuiden, Netherlands (Completion 2007-2011)
Capacity: Design: STILL Oven height: 6.4m
Replacement of
- throughwalls
- buckstays
- armour plates
- door frames
- tie-rods
Repair engineering
Set-up of site facilities
Supply of auxiliaries and refractory material
Supervision of refractory and mechanical installation
Execution of all kinds of refractory and steel work
Heating / commissioning
POSCO
Pohang, South Korea (Completion 2007)
Capacity: 750,000 t/year of coke, 75 ovens, chamber height 6.70 m

ArcelorMittal
Liège, Belgium (Completion 2006)
Installation of a pushing emissions control system.
Environmentally-friendly revamp of door extracting devices, delivery of a new hood car.

Taiyuan Iron & Steel Co., TISCO
Location Taiyuan, Shanxi Province, China (Completion 2006)
Capacity: 2.3 million t/year of coke, 140 ovens, chamber height 7.6 m
New battery with tall ovens

Mitsui Mining Co. Ltd.
Location Kitakyushu, Japan (Completion 2006)
Capacity: 565,000 t/year of coke, 46 ovens, chamber height 7.10 m
Pad-up rebuilt of a battery shut down in 1991

OTTO Corp., Tokyo
Fukuyama, Japan (Completion 2006)
Capacity: 650,000 t/year of coke, 55 ovens, chamber height 6.6 m
New battery
Maanshan Iron & Steel Co.
Maanshan, Anhui, China (Completion 2006)
Capacity: 2,100,000 t/year of coke, 140 ovens, chamber height 7.63 m

Carbonaria
Schwelgern (Hüttenwerke thyssenkrupp Stahl AG), Germany (Completion 2003)
Capacity: 2,600,000 t/year of coke, 155,000 Nm3/h of coke oven gas, 2 batteries, 70 ovens each, chamber height 8.4 m
World‘s largest coke oven batteries; TWINFLUE, Compound, Gun flue, PROven, Controlpress

ILVA (Riva Group)
Taranto, Italy (Completion 2000)
Capacity: 450,000 t/year of coke, New battery with 43 ovens, chamber height 6.5 m

ArcelorMittal
Bottrop, Germany (Completion since 1992)
Capacity: Design: STILL OTTO Oven height: 7.1m
Repair of
corbel area and regenerator
end flues
walls
buckstays
armour plates
door frames
Repair engineering and planning
Supply of auxiliaries and refractory material
Execution of all kinds of refractory and steel work
Development of a special repair technology
Gunning, cleaning of graphite, small repairs
Heating / Commissioning